A New Ann Arbor Train Station: Time to Weigh In

Recently the prospect of a new train station in Ann Arbor has supplanted the library lot has the most talked about and controversial local civic issue. With public comments on the Environmental Assessment Report due today, November 2nd, it’s time to weigh in.

20160427_065750

The report mentioned above was released by the city and Federal Railroad Administration back in in September stating the preffered alternative is to build a new train station and adjacent parking deck on a parking lot in Fuller Park. The history of a new station in Ann Arbor is exhaustive and has been covered impeccably by Ryan Stanton of the Ann Arbor News as well as by fellow blogger Vivienne Armentrout at Local in Ann Arbor (who may be the most informed person in town on this issue).  There’s also a great take by Doug Kelbaugh, Dean Emeritus at the Taubman College of Architecture & Urban Planning over at All Aboard on Depot Street.

Given the depth of information available on the subject, I will attempt to just briefly summarize the situation to date.  The vision for expanded rail and a new station in Ann Arbor goes back a long way, notably to John Hieftje’s Mayor’s Model for Mobility in 2006 that was partly the basis for the City of Ann Arbor’s Transportation Plan, adopted in 2009. This laid out a plan for a new intermodal station on Fuller Road to serve Amtrak and commuter rail to Detroit with a link to a seperate proposed light rail route, what later became the Ann Arbor Connector. The University is obviously a major stakeholder and it was suggested that the project be combined with additional parking for UM, predominantly health system students and staff. In the interest of brevity (highly recommend Vivienne’s article linked above for the full tale), the plan fell through, the university built a new parking deck on Wall Street, commuter rail as part of the RTA Master Plan failed at the ballot box in 2016 and the Connector is in limbo due to the enormous cost. So here we are trying to decide what to do with a decrepit existing Amtrak station with more questions than answers. On to my take.

I have something of a unique viewpoint on the train station in that I take Amtrak all the time. Like all the time. I took the train from Ann Arbor nearly 50 times in 2016, I’m taking it today. I even started a spreadsheet this year keeping track of my trips and times so that I had good anecdotal data for posts like this (average delay of 15:37 in 2017 thus far). It’s an imperative link for my job and provides connectivity and productivity that cannot be replicated with other forms of transit at this time.

That said, do we need a new station? Probably? The current one is small and seriously dated, not ADA compliant and the parking is a joke. There are plans to add service that should continue to increase ridership and Ann Arbor’s station is both the worst station on the line and the busiest. Should it be built in Fuller Park as a massive parking deck with sidecar station for a cost approaching $100 million?  Definitely not.

fe4d31c7ba490e42

Look hard, there’s a station there somewhere.

The only real positives of Fuller Park over another site is the proximity to the hospital and potential connectivity to the Connector. The argument has been made that the hospital location is important for commuter rail which I find dubious. The line may never happen (I’ve harped on the foolishness of a line that connects A2 to New Center) and let’s remember this line is geared towards Ann Arbor area residents traveling to Detroit, much less so the other way around (there may be 10,000+ employees at the health system, there’s 20+ times that in the greater downtown Detroit area).  A platform could be built on Fuller Park if needed in the future. The Connector, ahem, connection, would be great but the prospect of that project is dim given the astronomical cost. Betting on that line seeing the light of day is a low odds gamble.

a2_train_station_site

On the negative side, Fuller Park is, in fact, a park. While currently used for UM parking, it could and should be a public use riverfront park, not a massive parking structure. Also, while close to the hospital, it’s not close to anything else. There are no Transit Oriented Development opportunities, no neighborhoods nearby, no proximity to downtown.

The existing location on Depot Street has always been a train station, is near downtown and Lowertown, is on a major transit corridor via Broadway/Plymouth Road and offers some unique attributes with the DTE site next door. In short, if a new station should be built, it should go there.

The report gives a number of economic reasons for Fuller Park, a large one hinges on the expanding of the Broadway bridges (unnecessary in the short term) and the acquisition of DTE and Amtrak-owned land (estimated at $6.7M-$12M). How much should it cost to acquire Amtrak land for a new Amtrak station? I think a fair number is $0 but whatever it is, it’s low. What the report fails to take into account is that acquisition of environmentally contaminated land from DTE should also be cheap, in fact the opportunity to partner with DTE on the parking aspect of a future project on that land could very well be a net positive. While the new station needs more parking than it has now (often over capacity in my experience, the current lot is a muddy free for all), it does not need nearly 1,000 spaces unless a million transit positive things happen over the next 25 years. Parking in the short term could be tucked below Broadway and shared with a DTE project. Additionally, there are great opportunities for development and neighborhood connectivity with a transit hub. Fuller offers none of that.

We have a great opportunity here to build a new transit hub for Ann Arbor, a gateway to our town. Expanded train service with all new trains (currently on order) should result in increased ridership (side note: actual ridership projected to increase 19% this year from a construction addled 2016, up 45% over the past 20 years but just 0.5% over the past 10, true increases will require more scheduled runs, better service or higher gas prices). Building a massive parking deck in Fuller Park seems a move geared towards UM parking, takes over an existing park and offers no unique opportunities other than a link to a long shot Connector project.

Depot Street offers the chance to build in a historic location near downtown, create synergies on the DTE site and Lowertown and still connect to strong transit links via Broadway. Properly executed and phased, the project could start at less than half of current cost estimates and grow as needed with ridership and commuter rail links. Our transit future is uncertain with autonomous vehicles on the horizon so investments made now need to be incredibly prudent. Modest, phased construction at the current location is the best path forward.

 

 

 

6 thoughts on “A New Ann Arbor Train Station: Time to Weigh In

  1. Thank you for this analysis. As you might guess, I heartily agree.

    One of the great frustrations here (for me) is the likely missed opportunity to partner with DTE to make a great riverfront amenity. They’ve been hanging on for some time waiting for us to make it possible and now they have announced they will move ahead on their own. I hope that perhaps this can be retrieved as an option.

    Like

  2. Wonder if Peter Allen could shed some light on the city’s failure to partner w/ DTE on partial use of that site? I understand he is one of the proposed developers – maybe there is more going on there then meets the eye. He certainly seemed to have some influence w/ our former City Council rep. – who voted to allow expanded transit uses in parks and public land. But I suspect the real deal is one inked in private w/ Michigan Medicine for a new commuter lot. A scam from the beginning– my early repeated attempts to contact FRA with a large, annotated background on all the fishy doings around this project never resulted in a returned call – I sent them an exhaustive list of articles, meeting minutes and other materials, pointing out the many ways in which this process was being manipulated. No reply at all.

    Like

    • I’m no conspiracy theorist but to be perfectly honest, this process has always felt wrong. Just seems like someone wanted a particular outcome and the study was just a formality, steered towards that outcome. And you can’t help but wonder if UM was part of that given their parking needs. I’m not saying that’s what happened at all, but it’s impossible for that not to cross your mind given the way this has played out.

      Like

  3. All of us who have kept up to date over the years regarding the new train station debacle were convinced that the Fuller Park location would be the final pick. I don’t take the train as much as Ryan T., but I take it often enough to know that the vast majority of the time the Depot Street station is adequate for rail passengers. Yes, parking could use some upgrading, and there could be some other tweaks, but I don’t see a NEED to spend $86,000,000 (and according to Transportation Director Eli Cooper, the price could be $129,000,000).
    It is questionable if the projections for greatly increased ridership will ever come to fruition. Flat for 10 years, and actually down recently. With autonomous vehicles on the near horizon, I seriously question if ridership will ever increase substantially. Interestingly, at a presentation session, I asked both one of the consultant/planners and also Mr. Cooper if they considered the role of self driving vehicles, and both acknowledged they did NOT take them into consideration with planning needs.
    The Fuller Park location will mostly benefit the U of M and its employees and patients. Yet, I don’t see the U offering to pay the late majority of costs.
    I am in relative agreement with Ryan T., Vivienne A., and Jeff Hayner on the better location of Ann Arbor’s train station being at the current location.

    Like

  4. Loss of park land is often used as an argument against the Fuller Park location. Couldn’t that be addressed by having Amtrak purchase the land, enabling the city to purchase other land for park usage? I bet a parcel could be purchased — maybe part of the DTE site, or land along N. Main — that would be more useful park space than that Fuller Park strip.

    Like

    • Tim, the main thrusts to my objections to the Fuller Station is my belief there is no need to spend $86,000,000 plus on a new train station.

      Like